HCP, Inc.
Brisbane, California
Due Diligence
Existing Conditions Investigation
Entitlement Management
CEQA Management
Project Management
Schedule & Budget Management
Pre-Design Administration
Design Administration
Construction Administration
Occupancy Management
Project Accounting
Due Diligence/Condition Assessment
Project Management
Five Shell Buildings- 540,00 Total SF
Five Level 961 Car Capacity Parking Structure with 15,000 SF Retail Space
1,801 Parking Spaces (Structure & Surface Parking)
LEED Registered
Completion Date: In Progress
Architect: DES Architects + Engineers
General Contractor: Hathaway Dinwiddie Construction
Located on the Sierra Point peninsula in Brisbane, California, this property was the site of a municipal landfill until the 1960’s. Following Project Management Advisors, Inc.’s (PMA) completion of the due diligence/conditions assessment, developer and owner HCP, Inc. (acquirer of Slough Estates USA Inc.) purchased the land and retained PMA to manage the multi-phase project. The Britannia Sierra Point project consists of five life science shell buildings totaling approximately 540,000 square feet and a five story 961 car capacity parking structure. Because the property was previously used as a landfill, the foundations will be long steel H-Piles and each building will require a methane mitigation system. Each building will have service yards to house an emergency generator, electrical equipment, trash, storage and access for deliveries.